Offshore Construction & Installation
| Unit | Client / Location | Work Scope | Duration |
|---|---|---|---|
| 1 |
Newfield Peninsular Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom Puteri Pipeline Installation, Offshore Terengganu Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom |
Engineering, transportation, supply of miscellaneous materials, certain pre-fabrication scope, installation and pre-commissioning of a pipe-in-pipe bundle (12″ and 8″) with a 4″ piggyback |
May 2011 – Jun 2011 |
| 2 |
ONGC (JV with L&T Limited) MHN Redevelopment and MHN Process Platform and Living Quarters, Offshore Mumbai, India |
Transport and installation of platforms |
Dec 2010 – May 2011 |
| 3 |
Integrated Transportation and Installation of Offshore Facilities (PAN Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom), Offshore Terengganu, Sabah and Sarawak Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom |
Transport & installation of platforms & pipelines |
Mar 2010 – Dec 2013 |
| 4 |
Carigali-PTTEP Operating Company Transportation & Installation of Platforms, Bridges and EPCIC of Inter-Field Pipelines for JDA Block B-17 Field Development, Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom – Thailand Joint Development Area (MTJDA) |
Transport & installation of platforms and pipelines (up to 24″ pipeline and total 48 km) |
Nov 2007 – Feb 2009 |
| 5 |
PETRONAS Carigali Sdn Bhd (PCSB) Transportation and Installation of Offshore Facilities, Offshore Terengganu / Sarawak and Sabah, Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom |
Transport & installation of platforms & pipelines |
May 2004 – Nov 2006 May 2008 – Nov 2008 May 2009 – Nov 2009 |
| 6 |
ExxonMobil Exploration & Production Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom Inc. EMEPMI Year 2007 Installation Programme, Offshore Terengganu |
Transport and installation of platforms (Jerneh B & Jerneh A) and intrafield pipelines |
Mar 2007 – Feb 2008 |
| 7 |
ConocoPhillips (91-12) Pty Ltd Bayu Undan Floatover, Bayu Undan Field, Timor Sea |
Floatover CUQ topside 11,500 t, DPP topside 15,000 t |
Feb 2004 |
| 8 |
Woodside Energy Ltd Angel Platform Topside Floatover, Angel Gas Field, Western Australia |
Engineering, construction and installation project involving transportation and installation of the Angel topside module weighing 7,700 tonnes |
Nov 2005 – Jun 2008 |
| 9 |
Upstream Petroleum Basker Manta Subsea Installation, Bass Strait, Victoria Australia |
Installation and diverless tie-in of various subsea flowlines and control umbilicals |
Apr 2006 – Nov 2006 |
| 10 |
Conoco Phillips Belanak Buoy Recovery, Natuna Sea, Indonesia |
Isolate, flush and vent riser of hydrocarbons. Disconnect risers, umbilical and mooring chains off buoy. Recover sunk mooring buoy |
Dec 2010 – Mar 2011 |
| 11 |
Unocal Corporation West Seno Field Development, ‘Attaka’ Field, East Kalimantan, Indonesia |
Installation north TLP complete with all facilities 8 x 26″ tension legs & 8 x TLP tendon piles. Flowlines from TLP to FPU. 2 x 12″ oil flexibles and 1 x 4″ gas flexibles |
Aug 2001 – Nov 2003 |
| 12 |
OMV New Zealand Limited MAARI Wellhead Platform, Taranaki Basin, New Zealand |
EPIC contract for the Maari drill ACE platform (base, support structure and process deck) weighing approx. 10,000 tonnes |
Dec 2005 – Dec 2009 |