Engineering, Procurement & Construction
| Unit | Client / Location | Work Scope | Duration |
|---|---|---|---|
| 1 |
Larsen & Toubro Limited Deen Dayal West Field Development |
Construction for N14 jackect & N17, piles and conductor – ONGC (Mumbai high field) 2545 mt Tonnage 2,545 ton & 2,770mt |
May 2010 – Jan 2011 |
| 2 |
Larsen & Toubro Limited/GSPC Deen Dayal West Field Development |
Fabrication, loadout and seafastening of 6 legged jacket. Tonnage 4,530 |
Apr 2010 – Jan 2011 |
| 3 |
Newfield Peninsular Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom Inc. PM329 East Piatu Development Project |
Provision of fabrication, procurement, commissioning, loadout and seafastening of topside, CPP, living quarter and bridge of East Piatu development. Tonnage 4,161 mt |
Jul 2010 – Aug 2011 |
| 4 |
Murphy Sarawak PC of WP-PA Topside |
Fabrication and erection of coller deck structure, piping work, equipment function test, load-out and sea-fastening. Tonnage 590 mt |
Jun 2002 – Oct 2002 |
| 5 |
Newfield Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom PC of West Belumut WHP – Jacket & Topside |
Provision of procurement, construction of jacket and topside. Tonnage 1.153 mt |
May 2009 – Feb 2010 |
| 6 |
Petrofac Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom EPC Berantai Field Development Project – Topside & Jacket |
EPCC of wellhead platform (WHP-I) and the Angsi field tie-in at the Andre-A platform for Berantai field development project, block PM309. Tonnage 1,400 mt & 1,600 mt |
Dec 2010 – Sep 2011 |
| 7 |
Petrofac Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom SEPA-EPC of Process Skids & Refurbishment of MOPU |
EPCIC subcontract for mobile offshore production unit (MOPU) and wellhead support structure (WHSS) for Sepat early production system (EPS) for PCSB. Tonnage 1,200 mt |
Mar 2011 – Sep 2011 |
| 8 |
Murphy Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom FEPCIC – Wellhead Platform for Patricia |
Engineering, procurement, construction and commissioning (EPCC) of Patricia satellite. Tonnage 1,285 mt |
Aug 2011 – Mar 2011 |
| 9 |
Afcons – Gunanusa Joint Venture / ONGC (India) ICP-R and ICP-F3 Jackets |
Construction & onshore precomm of ICP-R, ICP-F3 jackets and piles. Tonnage 6,004 mt |
Aug 2009 – Dec 2010 |
| 10 |
Kebabangan Petroleum Operating Company Sdn Bhd (KPOC) KBB Substructure for Kebabangan Northern Hub Development |
Engineering, procurement, fabrication, inspection, testing and pre-commissioning, loadout & seafastening of KBB substructure, 8-legged jacket. Tonnage 13,393 mt |
Apr 2011 – Sep 2012 |
| 11 |
Petronas Carigali Sdn Bhd Tangga Barat Cluster Development |
Procurement and construction of Tangga Barat cluster development project (TBDR-A). Tonnage 5,013 mt |
Mar 2008 – May 2009 |
| 12 |
Exxon Mobile Exploration and Production Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom Inc. PC-Fabrication of Tapis R Jacket |
Procurement, fabrication, testing, loadout & tie-down of Tapis R jacket, piles & appurtenance. Tonnage 5,475 mt |
Mar 2012 – Jul 2013 |
| 13 |
Brunei Shell Petroleum Company Sdn Bhd AMPA-9 Compression Module |
Engineering, procurement & construction of AMPA-9 compression module. Tonnage 1,400mt |
Dec 2011 – Jan 2013 |
| 14 |
PT Sempec Indonesia ONGC – Heera Redevelopment Project |
Fabrication of 4 nos. Wellhead platform of deck, jacket, pile & conductors Heera development project. Tonnage 13,056 mt |
May 2007 – Nov 2008 |
| 15 |
Murphy Sarawak Oil Co Ltd EPC of Patricia Satellite for SK309/311 Sarawak Development Project |
Engineering, procurement and construction (EPC) of Patricia satellite (PT-SA) substructure and Serendah wellhead platform (WHP) template for SK309/311 Sarawak development project field developemnt. Tonnage 4,500mt |
2012 – 2013 |
| 16 |
Kencana Mermaid Drilling Sdn Bhd Self Erected Tender Rig & Derrick Equipment Set (KM-I) |
Design, construction & completion of self erected tender rig and derrick equipment set. Tonnage 8750 mt |
2009 – 2010 |
| 17 |
Bechtel – Wheatstone LNG Plant – ISBL Modules Wheatstone Project LNG Plant – Module Fabrication ISBL |
PC – Wheatstone LNG plant – ISBL modules. Tonnage 65,909 ton |
2011 – present |
| 18 |
Cameron Limited / BHP Biliton (Australia) BHP Pyrenees |
Engineering, procurement and construction of subsea manifolds and foundation mud mats. Tonnage 810 mt |
2007 – 2009 |
| 19 |
Aker Kvaerner (M) Sdn Bhd / Reliance Inductries Limited Ltd (India) Reliance KG-D6 |
9 units : 3 manifolds, 6 suction anchors for manifolds, I DWPLEM with suction anchor, I UDH with suction anchor, 3 SDA with suction anchors. Tonnage 2,337 mt |
2006 – 2007 |
| 20 |
FMC Wellhead Equipment Sdn Bhd (Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom) Gumusut Kakap |
5 subsea Wellhead Equipment Sdn Bhd (Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom). Tonnage 600 mt |
2008 – 2009 |
| 21 |
Bumi Armada M20, Bumi Armada |
Engineering, procurement & construction |
2008 – 2009 |
| 22 |
Prosafe Production Services Pte Ltd Prosafe Azurite Development Module Construction |
Detail engineering for electrical module and work drawings for all other module, procurement, fabrication, assemble, erection T&C |
2007 – 2008 |
Offshore Construction & Installation
| Unit | Client / Location | Work Scope | Duration |
|---|---|---|---|
| 1 |
Newfield Peninsular Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom Puteri Pipeline Installation, Offshore Terengganu Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom |
Engineering, transportation, supply of miscellaneous materials, certain pre-fabrication scope, installation and pre-commissioning of a pipe-in-pipe bundle (12″ and 8″) with a 4″ piggyback |
May 2011 – Jun 2011 |
| 2 |
ONGC (JV with L&T Limited) MHN Redevelopment and MHN Process Platform and Living Quarters, Offshore Mumbai, India |
Transport and installation of platforms |
Dec 2010 – May 2011 |
| 3 |
Integrated Transportation and Installation of Offshore Facilities (PAN Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom), Offshore Terengganu, Sabah and Sarawak Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom |
Transport & installation of platforms & pipelines |
Mar 2010 – Dec 2013 |
| 4 |
Carigali-PTTEP Operating Company Transportation & Installation of Platforms, Bridges and EPCIC of Inter-Field Pipelines for JDA Block B-17 Field Development, Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom – Thailand Joint Development Area (MTJDA) |
Transport & installation of platforms and pipelines (up to 24″ pipeline and total 48 km) |
Nov 2007 – Feb 2009 |
| 5 |
PETRONAS Carigali Sdn Bhd (PCSB) Transportation and Installation of Offshore Facilities, Offshore Terengganu / Sarawak and Sabah, Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom |
Transport & installation of platforms & pipelines |
May 2004 – Nov 2006 May 2008 – Nov 2008 May 2009 – Nov 2009 |
| 6 |
ExxonMobil Exploration & Production Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom Inc. EMEPMI Year 2007 Installation Programme, Offshore Terengganu |
Transport and installation of platforms (Jerneh B & Jerneh A) and intrafield pipelines |
Mar 2007 – Feb 2008 |
| 7 |
ConocoPhillips (91-12) Pty Ltd Bayu Undan Floatover, Bayu Undan Field, Timor Sea |
Floatover CUQ topside 11,500 t, DPP topside 15,000 t |
Feb 2004 |
| 8 |
Woodside Energy Ltd Angel Platform Topside Floatover, Angel Gas Field, Western Australia |
Engineering, construction and installation project involving transportation and installation of the Angel topside module weighing 7,700 tonnes |
Nov 2005 – Jun 2008 |
| 9 |
Upstream Petroleum Basker Manta Subsea Installation, Bass Strait, Victoria Australia |
Installation and diverless tie-in of various subsea flowlines and control umbilicals |
Apr 2006 – Nov 2006 |
| 10 |
Conoco Phillips Belanak Buoy Recovery, Natuna Sea, Indonesia |
Isolate, flush and vent riser of hydrocarbons. Disconnect risers, umbilical and mooring chains off buoy. Recover sunk mooring buoy |
Dec 2010 – Mar 2011 |
| 11 |
Unocal Corporation West Seno Field Development, ‘Attaka’ Field, East Kalimantan, Indonesia |
Installation north TLP complete with all facilities 8 x 26″ tension legs & 8 x TLP tendon piles. Flowlines from TLP to FPU. 2 x 12″ oil flexibles and 1 x 4″ gas flexibles |
Aug 2001 – Nov 2003 |
| 12 |
OMV New Zealand Limited MAARI Wellhead Platform, Taranaki Basin, New Zealand |
EPIC contract for the Maari drill ACE platform (base, support structure and process deck) weighing approx. 10,000 tonnes |
Dec 2005 – Dec 2009 |
Hook Up & Commissioning Greenfield
| Unit | Client / Location | Work Scope | Duration |
|---|---|---|---|
| 1 |
Trans-Thai Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom EPCIC of JDA Gas Balancing Evacuation Project (EVA project) |
EPCIC work of up to 90,000 man hours |
Jul 2013- Apr 2015 |
| 2 |
Kebabangan Petroleum Operating Company Sdn Bhd |
Provision of hook up and commissioning services for Kebabangan N.orthern Hub development project. 710,000 man hours |
Jun 2012- Dec 2014 |
| 3 |
Murphy Sarawak Oil Sarawak SK309/311 SPSA Development Project |
EPC work of Serendah (SN-PA) and Serendah accommodation (SN-AA) substructure for Murphy Sarawak’s SK309/311 at 1 million man hours |
Jun 2012- Oct 2014 |
| 4 |
Petronas Carigali Sdn Bhd Kumand Cluster Development Project |
Hook up and commissioning work for Kanowit CPP KAKG-A platform at 33.9 million man hours |
2010- 2011 |
| 5 |
Petrofac Pte Ltd Berantai Field Development |
EPCC of wellhead platform (WHP-1) and the Angsi Field tie in at the ANDR-A platform for Berantai Field Development Project |
2012 |
| 6 |
Petrofac Pte Ltd |
EPCIC of Sepat Early Production System (GPS) project for Petrofac |
2011- 2012 |
| 7 |
Carigali Hess Operating Company Cakerawala Gas Field Facilities |
Supply and installation of permanent living quarters and office cabins for Cakerawala Gas Field Facilities |
Feb 2013- Aug 2013 |
| 8 |
Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdomn Marine Heavy Engineering SB/ PCSB Kinabalu NAG Processing Platform |
Offshore hook up and commissioning work for Kinabalu NAG Processing Platform B (KNPG-B) at 1.5 million man hours |
Aug 2012- Mar 2013 |
| 9 |
IEV Group Sdn Bhd / Petronas Carigali Sdn Bhd |
Supply, delivery, installation & comissioning of refurbished wellhead platform, pipeline & host tie-in for D21 project |
Feb 2012- Jul 2013 |
| 10 |
Murphy Sarawak Oil Sarawak Development Project |
EPCIC of Patricia Satelite, PT-SA & West Patricia, WP-PA topside facilities for SK309/311 |
Feb 2013- Aug 2013 |
| 11 |
Hess Exploration & Production Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom North Malay Basin Field |
EPCC of KAMELIA-A wellhead platform (WHP) for Early Production Scheme (EPS), Integrated Gas Development (IGD), North Malay Basin Field |
Dec 2011- Mar 2013 |
Brownfield Rejuvenation
| Unit | Client / Location | Work Scope | Duration |
|---|---|---|---|
| 1 |
Petronas Carigali (PCSB) Samarang Redevelopment Project |
Provision of hook up commissioning for platform upgrading, revisit and IO modification for Semarang Redevelopment Project (Phase 2) including LQ upgrade at 1.5 million man hours |
Aug 2012- Dec 2014 |
| 2 |
Petrofac Energy Development |
Provision of hook up and commissioning for restoration of Bekok-C at 1.9 million man hours |
Jun 2012- Jun 2013 |
| 3 |
Carigali TTEP Operating Company |
CPOC MLQD offshore rectification works |
2009 |
| 4 |
Petrofac/ MISC Berhad |
EPCIC of riser balcony for provisions of tie ins modification works at Floating Storage & Offloading (FS)) facility for PM 304 Cendor Field phase 3 development West Desaru early production system |
May 2012- Nov 2012 |
| 5 |
Newfield Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom Puteri Oil Production Project |
PM318 restoration of Puteri Oil Production Project |
2011- 2012 |
| 6 |
ExxonMobil Exploration & Production Msia Inc |
EMEPMI DU3744 construction service contract at 1.82 million man hours |
2009- 2012 |
| 7 |
MISC Berhad Kikeh Field |
Provision of offshore preparation, hook up & commissioning for the additional containerized accommodation modules for 40 men for FPSO Kikeh facility for the Kikeh Field |
Feb 2013- Jun 2013 |
| 8 |
MDFT (SBM Building 18C, Spirit AeroSystems, Tarbolton Road, Monkton, Prestwick, South Ayrshire, United Kingdom & MISC Berhad) |
RFQ provision of offshore construction services for FPSO for Siakap North at 816,624 man hours |
Jun 2012- Sep 2013 |
| 9 |
Petronas Carigali Sdn Bhd |
Restoration of gas turbine compressor and LP gas recovery compressor for Sumandak phase 2 |
Apr 2013- Dec 2014 |